Tal Adass - Syria

Client

El Furat

Details
  • Revamping of bigset oil pumping station in Syria
  • Supply, Install and Commissioning the electrical panel. Instrumentation and control for oil network


  • GENERAL DATA
    1. 4 MAINE PUMPS
    2. 5 BOOSTER PUMPS
    3. 18 TANKS
    4. 48 MOTORIZED VALVES
    5. MV/LV TRANSFORMER
    6. 9 DELTA ORIFICE FLOWMETER
    7. 18 PRESSURE SENSOR
    8. 20 LEVEL METER


  • CONTROL-COMMAND
    1. REDUNDANT SCADA
    2. -HOTSTAND BY PLC
    3. 128 ANALOGUE MEASUREMENT
    4. 40 PID
    5. REVAMPING INSTRUMENT
    6. FLOW, PRESSURE, LEVEL